GUANYA Completes Installation and Debugging of Valve Positioners

Views:408
Update time:2025-03-18

Recently, at the request of our client, our technical team completed the troubleshooting, repair, installation, and debugging of valve positioners at the National Pipeline Network’s West-East Gas Pipeline-23 Gas Storage Facility, ensuring the safe and stable operation of the facility.

 

Project Background

The West-East Gas Pipeline-23 Gas Storage Facility is a critical component of China’s natural gas storage and transportation system. Its efficient operation is essential for ensuring energy supply. As a core component of the control system, the valve positioner directly affects the precise regulation of valves and the stable operation of the pipeline network.

Service Details

Equipment Installation:

Our technical team strictly followed operational standards to complete the installation of the valve positioners, ensuring perfect compatibility with the valves.

 

System Debugging:

The team conducted precise debugging of the positioners to ensure their response speed, control accuracy, and stability met design requirements.

 

On-site Training:

We also provided detailed operation and maintenance training to the client, helping them better understand and utilize the equipment.

Client Feedback

The client highly praised the professionalism and efficiency of our technical team, stating that the installation and debugging work laid a solid foundation for the long-term stable operation of the gas storage facility.

 

About Us

GUANYA is committed to supplying high-quality industry valves and providing installation, debugging, and technical support services for valves and related equipment. In the future, we will continue to leverage our expertise and excellent service to help clients achieve efficient equipment operation and stable energy system performance.

Related News
Read More >>
Pressure Gauges for Valve Positioners Delivered to Offshore Platform (Bohai, China)
2026-04-08
Recently, we successfully completed the supply of pressure gauges for valve positioners for an offshore platform project in Bohai, China (CNOOC). The project required pressure gauges to be used with valve positioners, with a specified brand of Severn Glocon. Given the offshore application, high requirements were placed on product reliability and compatibility. During the initial stage, the client provided detailed …
From Inquiry to Delivery: A Fast-Track Intrinsic Safety Barrier Project
2026-03-24
In industrial automation and process control systems, intrinsic safety is never optional — it’s essential. Recently, we supported a domestic DCS system integrator by supplying a batch of intrinsic safety barriers from Pepperl+Fuchs. While the project size was moderate, the timeline was tight and required both technical accuracy and fast execution. Project Background: The client, a DCS system provider, was …
Professional Service Resolves Valve Winter Freeze-up Issue at National Pipeline Network LNG Project
2025-12-15
Recently, as the official agent of SEVERN GLOCON, we received feedback from users that some valves supplied by SEVERN failed to operate under extreme winter temperatures at the Tianjin National Pipeline Network Liquefied Natural Gas (LNG) Phase II project, a national key energy project. The smooth operation of this project is crucial for energy security and public livelihood. Any potential …
Successfully Delivers Air Storage Tanks for Sonatrach’s MTBE Project in Algeria
2025-10-15
Successfully Delivers Air Storage Tanks for Sonatrach’s MTBE Project in Algeria Guanya Petrochemical is proud to announce the successful completion and third-party certified acceptance of custom-designed air storage tanks for the MTBE project of Sonatrach, Algeria’s national energy company. This achievement highlights our unwavering commitment to quality and international standards in serving the global energy sector.   Project Overview Client: …

Leave Your Message