Equipment Testing & Debugging

Views:510
Update time:2025-02-08

With our professional technical team and sophisticated testing equipment, we conduct rigorous testing and optimization debugging of instruments to ensure that the products achieve optimal performance before installation and operation.

Related News
Read More >>
Successfully Supplied SEVERN GLOCON Control Valve & Actuator Repair Kits for CNOOC Platform 19-6
2026-05-07
CNOOC Platform 19-6 is one of the key facilities in the first large-scale, high-yield condensate gas field in China’s Bohai Sea. The platform operates under complex conditions, demanding high reliability and the timely supply of maintenance spare parts for critical control valves. A large number of SEVERN GLOCON high-performance control valves and pneumatic actuators are used on the platform for …
Pressure Gauges for Valve Positioners Delivered to Offshore Platform (Bohai, China)
2026-04-08
Recently, we successfully completed the supply of pressure gauges for valve positioners for an offshore platform project in Bohai, China (CNOOC). The project required pressure gauges to be used with valve positioners, with a specified brand of Severn Glocon. Given the offshore application, high requirements were placed on product reliability and compatibility. During the initial stage, the client provided detailed …
From Inquiry to Delivery: A Fast-Track Intrinsic Safety Barrier Project
2026-03-24
In industrial automation and process control systems, intrinsic safety is never optional — it’s essential. Recently, we supported a domestic DCS system integrator by supplying a batch of intrinsic safety barriers from Pepperl+Fuchs. While the project size was moderate, the timeline was tight and required both technical accuracy and fast execution. Project Background: The client, a DCS system provider, was …
Professional Service Resolves Valve Winter Freeze-up Issue at National Pipeline Network LNG Project
2025-12-15
Recently, as the official agent of SEVERN GLOCON, we received feedback from users that some valves supplied by SEVERN failed to operate under extreme winter temperatures at the Tianjin National Pipeline Network Liquefied Natural Gas (LNG) Phase II project, a national key energy project. The smooth operation of this project is crucial for energy security and public livelihood. Any potential …

Leave Your Message