Successful FAT for Algeria MTBE Project Instrument Equipment

Views:172
Update time:2025-05-13

We are pleased to announce that the Factory Acceptance Testing (FAT) of Coriolis Mass Flow Meters and Radar Level Transmitters, conducted by TÜV as the third-party inspection authority on March 29th, has been completed!

The inspection ensured compliance with technical specifications, quality standards, and project requirements.

Key Activities:

  1. Scope of Inspection:
  2. Mass Flow Meters: Verified measurement accuracy, material compliance, and communication protocols (e.g., HART, MODBUS).
  3. Radar Level Transmitters: Checked antenna type, confirmed signal stability, range calibration, and explosion-proof certifications (e.g., ATEX/IECEx for hazardous areas).
  4. TÜV Oversight: Ensured adherence to international standards and project specifications.
  5. Documentation Review: Approved test reports, calibration certificates, and manuals.
  6. Testing & Compliance:

Witnessed performance tests (e.g., zero-point calibration, loop checks).

Confirmed documentation (O&M manuals, calibration reports, packing lists).

Validated material traceability.

Outcome:

  • All equipment passed inspections, ensuring readiness for shipment and installation.
  • Non-conformities (if any) were documented and resolved before release.

Next Steps:

  • Equipment preparation for on-time shipment to Algeria.
  • Coordination for smooth installation & commissioning.

This milestone underscores our commitment to quality and reliability in the MTBE project.

Related News
Read More >>
Successfully Delivers Air Storage Tanks for Sonatrach’s MTBE Project in Algeria
2025-10-15
Successfully Delivers Air Storage Tanks for Sonatrach’s MTBE Project in Algeria Guanya Petrochemical is proud to announce the successful completion and third-party certified acceptance of custom-designed air storage tanks for the MTBE project of Sonatrach, Algeria’s national energy company. This achievement highlights our unwavering commitment to quality and international standards in serving the global energy sector.   Project Overview Client: …
Moore Industries PSD Programmable Scan Display In-Stock Inventory – Enabling Rapid Project Response
2025-08-04
Project Background To meet the urgent needs of industrial automation clients for high-end display equipment, we have proactively purchased Moore Industries PSD Programmable Scan Displays as strategic inventory. Known for their high-precision data acquisition, flexible programming configuration, and industrial-grade reliability, these devices are widely used in automation control systems across industries such as petrochemicals, power energy, and water treatment. Customer …
China National Pipeline Tianjin LNG Phase II Project – SEVERN Valve and Actuator Commissioning & Maintenance, Supporting Energy Supply Security
2025-07-31
Project Background The China National Pipeline Tianjin LNG Phase II Project is a key national initiative for interconnected natural gas infrastructure and a vital component of China’s “Production-Supply-Storage-Sales” energy system. As a critical energy hub in North China, the project elevates the Tianjin LNG Terminal into the 10-million-ton annual capacity tier, with a gas supply capacity of 12 million tons/year, …
V-Port Ball Valves Successfully Complete Factory Acceptance Tests, Ready for Delivery
2025-05-14
The 250,000-ton crude oil import terminal and associated pipeline project at Dongying Port is a key energy initiative in Shandong Province. As the critical link between the wharf and storage tank farm, the pipeline system (Dongying Port Terminal Station) demands exceptionally high reliability and safety standards for its valves. As a core supplier of fluid control equipment, our company provided …

Leave Your Message